Snowy River Limited
Snowy Hydro Limited is an Australian company with a rich history in renewable energy. It is best known for the construction of the Snowy Mountains Hydro-electric Scheme, a significant infrastructure project that shaped Australia's history. Snowy Hydro has evolved into an integrated energy business with 16 power stations and retail businesses. The company's expansion includes the acquisition of gas and diesel assets, extending its footprint into Victoria and South Australia. Snowy 2.0, a nation-building project, aims to support Australia's transition to renewables by generating clean and reliable energy for future generations.
Snowy River Limited
Snowy Hydro Limited is an Australian company with a rich history in renewable energy. It is best known for the construction of the Snowy Mountains Hydro-electric Scheme, a significant infrastructure project that shaped Australia's history. Snowy Hydro has evolved into an integrated energy business with 16 power stations and retail businesses. The company's expansion includes the acquisition of gas and diesel assets, extending its footprint into Victoria and South Australia. Snowy 2.0, a nation-building project, aims to support Australia's transition to renewables by generating clean and reliable energy for future generations.
snowyhydro.com.au
61 High Country Rd Weaverville, North Carolina 28787, US
Details
Year founded
N/A
Revenue
500K-1M
Employees
1-10
Number of locations
1
NAICS
333
SIC
3523
Products & Services
Outlines the company's specialized services and operational strengths.
- Electricity and gas products
- Renewable energy products
- Contact us in order to access
Equipment
Provides a detailed list of machinery and tools utilized on the company's premises.
- Tunnel Boring Machine 1 (TBM 1) - Designed to bore through hard rock, constructed by Herrenknecht AG, 205m in length, 11m diameter, able to excavate up to 30m of rock per day
- Tunnel Boring Machine 2 (TBM 2) - Designed to excavate hard rock, constructed by CREG, 137m long, 11m diameter, able to excavate up to 30m of rock per day
- Tunnel Boring Machine 3 (TBM 3) - Designed to operate in 'slurry mode', constructed by Herrenknecht, 142m long, 11m diameter, expected to tunnel around 30m of rock per day
- Contact us in order to access
Ramping up production
Indicates the company's current production trend and growth trajectory.
FALSE
Our production algorithm is showing that snowy river is not ramping up production.
Target industries
News
The 'Man from Snowy River' makes a comeback
The 'Man from Snowy River' makes a comeback
Bill McAuley's 40-plus-year news career began in 1969 as a cadet photographer at 'The Age' in Melbourne. Bill has several...
Locations (1)
Snowy River Limited
61 High Country Rd Weaverville, North Carolina 28787, US
Frequently Asked Questions
What services & capabilities does Snowy River Limited offer?
Snowy River Limited offers a range of services and capabilities, including Electricity and gas products.
What kind of equipment does Snowy River Limited use?
Snowy River Limited uses a variety of equipment, including Tunnel Boring Machine 1 (TBM 1) - Designed to bore through hard rock, constructed by Herrenknecht AG, 205m in length, 11m diameter, able to excavate up to 30m of rock per day.
What are the target industries of Snowy River Limited?
Snowy River Limited serves several industries, including the energy industry.
How many locations does Snowy River Limited operate?
Snowy River Limited operates from a single location at 61 high country road, weaverville, north carolina 28787, united states.
Where are the headquarters of Snowy River Limited?
The headquarters of Snowy River Limited are located in 61 high country road, weaverville, north carolina 28787, united states.
What is the NAICS code for Snowy River Limited?
The NAICS code for Snowy River Limited is 333.
How many employees does Snowy River Limited have?
Snowy River Limited has 1 employees.
What is the official website of Snowy River Limited?
The official website of Snowy River Limited is https://www.snowyhydro.com.au/.